Projects On Hand

The following water supply and sewerage projects proposed under JNNURM scheme, are under implementation

Projects Back Projects On Hand THE FOLLOWING WATER SUPPLY AND SEWERAGE PROJECTS PROPOSED UNDER JNNURM SCHEME, ARE UNDER IMPLEMENTATION The following water supply and sewerage projects proposed under JNNURM scheme, are under implementation SI.No Name of the Project Cost (Rs in Crores) Status A Water Sector 1 Pipeline Project from Sahebnagar to Prashasan Nagar 94.93 98% completed 2 Pipeline Project from L.B.Nagar to Marredpally 81.20 65% completed 3 Building Additional Storage Reservoirs on North of Musi – 50.5 ML at 7 locations 29.81 20% completed 4 Building Additional Storage Reservoirs on South of Musi – 49.50 ML at 7 locations 33.55 15% completed 5 Providing flow & level measures and SCADA System for all reservoirs and bulk supply mains in HMWSSB 9.90 Tender Stage 6 Krishna Drinking Water Supply Project Phase-II* 817.62 85% completed Sub-Total 1067.01 B Sewer Sector: 7 Rehabilitation and Strengthening of Sewerage System in Old City area on South of Musi (in Zone – 1 in catchments S1 to S6, S12 and S14) 148.81 Tender Stage 8 Rehabilitation and Strengthening of Sewerage System in Old City area on South of Musi (in Zone – 2 in catchments S7 to S11, S13 and S15) 250.00 DPR approved on 17-8-07 by GoI Sub-Total 398.81 TOTAL 1465.82 II. Projects on Hand other than JNNURM: SI.No Name of the Project Cost (Rs in Crores) Status A Water Sector 1 Abatement of Pollution of River Musi at Hyderabad under NRCP Assistance (NRCD Project) 339.08 63% completed 2 Strengthening and Improvement for the Sewerage System in MCH Area 150.00 68% completed TOTAL 489.08 II. Projects Under Pipeline under JNNURM (2007-08): SI.No Name of the Project Sector Cost (Rs in Crores) Present Status 1 Providing inlet & outlet mains to the proposed additional storage water reservoirs for distribution of water in the identified zones of North & South of Musi river under MCH limits Water Supply 130.00 DPRs Under appraisal with JNNURM, GoI 2 Comprehensive Energy Audit for Pumping Stations under distribution network of HMWSSB Water Supply 33.00 3 Implementation of Sewerage Master Plan in Serilingampally Municipality Sewerage 200.00 4 Laying of Trunk Mains from Master Balancing Reservoir to Service Reservoirs (Augmentation of Transmission Network Supplying Water to Primary Service Reservoirs) Water Supply 178.00 DPR under submission to JNNRUM, GoI 5 Rehabilitation And Strengthening (upsizing) of Sewerage System in Zone-IV on North of Musi in MCH Area (i.e Catchments N11, N13, N14, N15, N16 & N32, N34 ) Sewerage 250.00 TOTAL 791.00

Read More